Key performance indicators (KPIs) can be used to:
- Monitor costs.
- Track progress.
- Assess client satisfaction.
- Identify strengths and weaknesses.
- Compare performance across and between projects.
- Assess specific areas of a project such as sustainability, safety, waste management, etc.
It is important that KPIs are identified in tender documentation and that the regular provision of the information required to assess them is a requirement of the contract. This may require the provision of sub-contractor information where performance on specific packages is to be monitored.
KPIs may be of particular importance where the contract stipulates that the contractor will be rewarded or penalised based on their performance relative to certain indicators.
Examples of KPIs that can be used on construction projects include:
- Cost vs. budget. The budgeted cost of work that has actually been performed in carrying out a scheduled task during a specific time period.
- Project progress relative to milestones.
- Number of complaints.
- Number of incidents/accidents.
- The number of working hours spent on different aspects of the works.
- The use of materials (for example, the amount of concrete poured).
- The number of defects.
- The amount of waste generated and the amount of recycling.
- The number of variations.
KPIs are also a means to help with the rapid comprehension of the current financial position. KPIs summarise the comparison of figures against the budgeted values and also industry benchmarks that are published from the result of inter-firm comparison reports.
KPIs to track profitability may include:
- Turnover by director /partner.
- Turnover by fee earner.
- Profit by director/partner.
- Profit by fee earner.
Only genuinely important performance indicators should be monitored so that it does not simply become a time consuming paper exercise.
KPIs can also be used more broadly as part of a bench-marking exercise to assess the performance of one project relative to another, to assess businesses compared to others within the industry and to assess the performance of the industry as a whole relative to the rest of the economy.
[edit] Related articles on Designing Buildings
- Acceleration.
- Benchmarking.
- Best value.
- Budget.
- Building performance.
- Contractor's master programme.
- Defects.
- Design web.
- Earned value.
- Facility condition index FCI.
- Health performance indicators in the built environment.
- How progress is agreed in construction.
- Identifying the causes of trends in construction labour productivity.
- Information release schedules.
- Market value.
- Mechanical and electrical maintenance customer satisfaction KPI's 2017.
- Milestones.
- Performance.
- Performance requirements.
- Programme consultant.
- Progress of construction works.
- Project crashing.
- Project programme.
- Project scorecard.
- RAG rating.
- Schedule performance index (SPI).
- Short period programme.
- Strategic performance targets.
- Time-location chart.
- Time management of construction projects.
- Track record.
- Turnover.
- Variations.
- Value management.
- Whole life costs.
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February
Comments